Bridge over the Pek River

Bridge over the Pek River

Year: 2023
Location: Kučevo – Neresnica section, directly connected to the state road IB class No. 33, Kučevo – Debeli Lug section
Responsible Designer: Nikola Đorđević

Project Description:
Concept Design and Detailed Design for Construction

The project covers the first phase of development, which includes works on the municipal road No. 25, from km 0+13.634 to km 0+109.622. The second phase, which is not part of this documentation, will include the widening and integration of the road with the state road IB class No. 33, as well as works on the municipal road No. 25 from km 0+00.000 to km 0+13.634.

The project предусматриes partial demolition of the existing bridge and roadway, and the construction of new bridge elements with a roadway over the Pek River in Neresnica. In order to improve traffic safety and road functionality, modifications to the road’s geometric design have been adopted.

Location:

Serbia

Client:

Municipality of Kučevo