
Mostprojekt has commenced a professional inspection and testing of the approach structures on the New Belgrade side of the bridge over the Sava River, in the area of access to the “Novi Beograd” railway station.
The scope includes three approach bridge structures (I, II and III), constructed as continuous box girders made of prestressed reinforced concrete, with a total of 17 spans.
The aim of the works is a comprehensive assessment of the structural condition, identification of any potential damage, as well as verification of the quality of the installed materials, in order to ensure long-term and safe operation of the bridge.